laying ceramic tiles

Basic rules for laying ceramic tiles

Before laying tiles should be performed tight foil backing in the form of vapor-permeable, or - if required by the degree of hipped roof end or the climatic conditions in the building place - complete roof boarding covered with roofing paper.

On the prepared roof poking out battens and patches. Spacing patches should be measured for a particular tiles, according to the manufacturer's instructions. We get patches installed combs attached hood and flashings and gutters, you can start laying the tiles. The tiles are laid from the eaves up. For added stability and security roofing against strong wind, it is recommended agraphing every third tile diagonally.

Clamped or attached to the patches for example by means of screws you also need to tile extreme. In places such as baskets, chimney or roof windows zone around where it is necessary to cut, tiles must be cut in such a way that dust does not enter on the tile or under it, because it is difficult to remove, especially if you do not do to it right away. If the roof comply with foil roof, dust can clog the pores and cause it to lose its membrane vapor permeability . That's why cutting is best done outside hipped roof end. During laying the tiles must be properly deploy roofing accessories, including ventilation tiles that are key for air circulation under the hipped roof end. The number and distribution of ventilation of roof tiles depends on the shape and dimensions of the roof. Most often they are arranged in the third row under the roof ridge. To ensure adequate ventilation has to be ensured inlet and tongue the air at the eaves and the roof ridge. An important principle is the need to pose weather strip on the roof ridge under ridge tile. Same ridge tile is attach with a special clamp, and screwing the screws to the roof ridge.

Back

Add comment